Location

The mine is located in amphoe Janae , Narathiwas province.

Standard Post with Image

Distant from Mine to Jetty

70 Km from the mine to Jetty at Narathiwas About 1:17 hours by truck

Read More
Standard Post with Gallery
Standard Post with Gallery

Crushing Plant

the company also has the crushing and grinding plan. It is capable of processing higher than 3,000 tons per day.

Read More

Our own Jetty

After the crushing and grinding process, to deliver to the customer, the product will be loaded from the AMPC port by barge to the middle of the Gulf of Thailand. The loading capacity is 5,000 to 50,000 Tons. Loading Rate is 5,000 to 8,000 Tons per day.

Read More
Standard Post with Image

USED OF SERPENTINE

Serpentine is substitute for Dolomites in iron making process. Using 2 Tons of dolomite = 1 Ton of Serpentine Dolomite has no Iron (Fe) contained , while Serpentine has contained iron which 1% of Iron in Serpentine could value about 1 USD per Ton. It is a high-quality flux for adjusting the pH of molten iron during sintering and iron making. According to the data, compared with dolomite power, the cost per ton of hot metal can be reduced by 8-12 USD the steelmking product yield can be increased by 1%, the cost can be reduced by 2% the quality of steel can be increased by 3%, 4% - 7%, saving money for ironworks.

Read More